SupremeOR · Industrial sorbent · Hydrocarbon remediation

Spill chemistry, rewritten.

Built to live at the bay. Pours, sweeps, holds the spill in place. Materially shifts the saturated-material classification conversation with your hauler. SDS, W-9, COI same business day. NET-30/45/60 on approved credit.

American-made SDS · W-9 · COI same-day Bag · SuperSack · drum formats NET-30/45/60 on approved credit
Why operators choose SGP+

Built for the truckload. Priced for the program.

  • +$326/cow combined added value (RanchRevive Performance Trials, 2014-present)
  • +0.75 lbs/day ADG — 487 to 667 lb calves at 240 days
  • 95 to 98% calf-crop rate improvement across program herds
  • ~25% less grass intake and ~30% less water
  • $0.40/day ration cost ($146/yr) — replaces $190+ conventional programs
  • 2.25x reference ROI on 12-year field record (RanchRevive Performance Trials, 2014-present)
$65.00
per 2,200 lb bale · FOB Napoleonville, LA
Calculate delivered cost ›
Indicative pricing — bag/tier selections below are quote-only. Cart charges the standard 2,200 lb bale rate; final truckload quote provided via Get instant quote.
Bag size (indicative)
Truckload tier (indicative)
Volume$/ton$/bag
1-4 pallets$945$1,040
5-19 pallets$895$985
20+ pallets$845$930
Truckload$795$875
Get instant quote

Ships from Napoleonville, LA. Freight calculated at checkout by zone. FTL (46,000 lb) economics — small orders cost more per ton.

$65.00 per 2,200 lb bale

Estimate your delivered freight

Pick your zone from Napoleonville, LA for an indicative added-freight estimate. Final freight is quoted by zone at checkout.

Estimate delivered freight
Added freight Select a zone
Per head / year

FTL flatbed (46,000 lb) economics assumed. LTL or partial orders run 2-3× more per ton. Final freight is quoted by zone at checkout.

Open the full ROI + freight calculator ›
Procurement math

The four-bay tipping point.

Below four bays, 5-gallon pails per bay pencil fine. At four bays and up, the math flips to central-shop SuperSack with bay-level bins. Multi-shop fleets stack a recurring contract on top.

1–3 bays

5-gallon pails
  • One or two working pails at each bay
  • Restock from a small back-shop supply
  • Lowest inventory risk, highest per-pound cost
  • Standard shop apron + service-bay use case
Tipping point

4+ bays

Central-shop SuperSak
  • SuperSak in central shop, bay-level bins dispense
  • Per-pound price drops materially vs 5-gal
  • Turnover clears bulk format well inside shelf life
  • Bay tech reaches for less per spill once technique adjusts

Multi-shop fleet

Recurring contract
  • SuperSak per shop, scheduled delivery cadence
  • Multi-truck recurring discount stacked on top
  • NET-30/45/60 underwritten once, used across the network
  • Bay-level burn rate stabilizes across the contract
What changes

vs clay sweep · poly pads · generic granular.

Comparison metric SupremeOR™ Clay sweep / oil-dry Poly pads / socks Generic granular
Spill behavior Encapsulates + holds in place Smears under boot/tire Great for contained spills, slow on bay floor Clay-sweep variant in different bag
After pickup Dry to the touch Slick greasy film Clean if used in time Similar to clay sweep
Capacity per pound Higher Low Variable Low
Haul-away invoice Materially changes the classification conversation Saturated = manifested haz waste Saturated = manifested haz waste Saturated = manifested haz waste
Procurement docs SDS / W-9 / COI same business day Standard Standard Variable
Best use Bay floor, fuel island, equipment yard Anywhere cheap up front, expensive on back end Machinery, water, contained drips Anywhere clay sweep would go

Regulatory note: classification of saturated material depends on the original contaminant and the operator's local hazardous-waste rules. We provide the documentation; your EHS owner and waste hauler make the call.

Procurement-ready

Documentation hits your portal same business day.

SDS

Safety Data Sheet

Current OSHA / GHS format. To your EHS binder same day.

W-9

Vendor W-9

Signed, current. For your vendor onboarding portal.

COI

Certificate of Insurance

Current. Additional-insured endorsement available.

PO

Onboarding packets

Any procurement-portal form turned inside one business day.

In service

Operator photo
We're running SupremeOR across four bays since 2024. Hauler conversation moved. Bay floors stay cleaner between shifts. Volume burn trending below sweep program.

Gulf-Coast RemediationContractor · Louisiana · 4-bay deployment · 2024-present

4

Bays in deployment

2024

Start of contract

Active

Continuing recurring order

Gulf-coast remediation contractor - 4-bay deployment, 2024-present. Full case study + waste-stream classification data available under MNDA via the quote form.

B2B + Recurring contract

Spec your shops. Get a quote in one business day.

Send bay count per shop, number of shops, approximate monthly absorbent burn, and current sorbent type. We come back with a per-pound SuperSack price, a recommended bay-level format, a haul-away savings estimate, and the SDS/W-9/COI package to your procurement portal same business day.

We reply within 1 business day. No spam.

Tell us about your operation

Submitting sends your details to the RanchRevive sales desk. We do not share or sell contact information.

SupremeOR FAQ

Questions procurement asks.

Ready when you are

Ready to revive your operation?

Run the calculator. Talk to a rep. Or order a sample. No high-pressure sales loop.